Otford Methodist Church Kitchen Adaption

Otford Methodist Church Kitchen Adaption

The church decided to utilise the cupboard space in the exisitng kitchen.  Originally they had 2 units but the bottom one could not be used as their was a water heater unit inside that was blocking access to the valves.

BEFORE

Image link

Hennessy Ltd’s plumbing and heating services managed to move the unit into a new tower unit, making it easier to access the valves and creating extra cupboard space.

AFTER

Image link
Image link
Related Posts
Leave a Reply

Your email address will not be published.Required fields are marked *